NEC 2023 & NEC 2026 load calculations · licensed-electrician verification on every scopeestimates@reillyelectrical.com
Reilly ElectricalLoad Engineering & Project Scoping

About

About Reilly Electrical

An independent electrical estimating and project-scoping practice. We do the load engineering first, so property owners can buy the right electrical work at the right price.

Electrician working on breaker panel hardware

Why Reilly Electrical exists

Most homeowners meet an electrical service upgrade the hard way: an insurer's letter, an EV dealer's warning, a heat pump contractor who says the panel is "too small". The quotes that follow can differ by thousands of dollars for what sounds like the same job, and few come with the load calculation behind them.

Reilly Electrical brings the electrician's side of that conversation to the property owner first. We publish NEC-accurate load and generator calculations, transparent 2026 installed pricing and plain-English code guidance, so you walk into a quote knowing your calculated amps, your options and a realistic budget.

What we do

  • Load engineering tools. A free NEC 2023 / NEC 2026 optional-method load calculator and an NEC 702.4 standby generator sizer, each producing a printable calculation sheet.
  • Cost and code guidance. Pages on panel and service upgrades, hazard panels, EV load management, smart panels, generators and light commercial work, with cited code sections and 2026 cost ranges.
  • Project scoping and matching. When you submit a project scope, we review it and pass it — with your calculation — to a licensed local master electrician or dealer suited to the job, who verifies on site, handles the permit and quotes.

Editorial and calculation standards

  • Every formula is documented on the methodology page and every result line names its NEC section.
  • Cost ranges are full installed ranges, not "starting at" teasers, and expired incentives such as the federal 25C panel credit are never counted.
  • We do not publish ratings, testimonials or license numbers we cannot stand behind, and we do not rank contractors for payment.
  • Calculations are preliminary. The licensed electrician who surveys the property and your local Authority Having Jurisdiction have the final word.
Electrician using a drill on breaker panel hardware
Every scope ends with an on-site survey by a licensed electrician before work is quoted as final.

How contractor matching works

  1. You send a project scope from the request form, ideally with a calculator sheet attached.
  2. We check that the scope is complete — panel brand, service entry, ZIP code, urgency — and follow up by email if something is missing.
  3. We pass the scope to a licensed electrical contractor (or, for generators, an authorized dealer) serving your area. Contractors we work with may pay a referral fee; you never pay us.
  4. The contractor contacts you, verifies on site and quotes. You are under no obligation to hire them.

Independence notice

Reilly Electrical (reillyelectrical.com) is an independent US electrical estimating and project-scoping practice. It is not affiliated with Reilly Electrical Contractors, Inc. (RELCO) of South Easton, Massachusetts, Reilly Electric Company of California, Reilly Electrical Services of Maryland, Reilly Electric Inc. of Pennsylvania, or any other contractor that shares the Reilly name, in the US or abroad. We do not perform electrical installation ourselves; licensed local contractors do.

Contact

Email estimates@reillyelectrical.com with questions about a calculation, a correction to a page, or a project. We reply by email, usually within one business day.

Photography: Pexels (pexels.com) contributors, used under the Pexels license.

Get a scoped quote, not a guess

Send your NEC load sheet, panel brand and ZIP code. A licensed local master electrician confirms the numbers on site, pulls the permit and quotes the real job.