Load Calculator · NEC 220.82 / 120.82
NEC Residential Service Load & Panel Upgrade Calculator
Find your calculated service demand in amps under NEC 2023 or NEC 2026, see whether your existing panel can carry an EV charger, heat pump or hot tub, and get a 2026 budget for the upgrade or the load-management alternative.
NEC Service Load Calculation Sheet
Single-family dwelling · Optional method · Reilly Electrical
Estimated installed budget · 2026
Budget
| Line item | Range |
|---|
Ranges include equipment, labor, permit and inspection. Utility fees are set by your utility and can exceed these figures where a transformer or new lateral is required.
Prepared with the Reilly Electrical calculator on . Reproduce this calculation:
Preliminary planning estimate only. Final service sizing, code edition and installed price are determined by a licensed electrician after an on-site survey and by the local Authority Having Jurisdiction (AHJ) and serving utility. Reilly Electrical · reillyelectrical.com · estimates@reillyelectrical.com
How this calculator works
This is the optional method for a single-family dwelling: NEC 2023 section 220.82, renumbered 120.82 in NEC 2026. It is the method most electricians use to justify a service size on a permit, and it is the one utilities ask for when you add an EV charger or heat pump.
- General load (G). Square footage × 3 VA (NEC 2023) or 2 VA (NEC 2026), plus 1,500 VA for each small-appliance and laundry circuit, plus the nameplate of every fastened-in-place appliance.
- Demand factor. The first 10,000 VA of G counts at 100% and the rest at 40%.
- HVAC. Add the larger of the cooling load (100%) or the heating load: heat pump at 100%, heat pump plus strips at 100% compressor + 65% strips, central electric heat at 65%, separately controlled heaters at 65% (fewer than four) or 40% (four or more).
- EV charging. An unmanaged Level 2 charger counts at its nameplate (at least 7,200 VA); a charger behind a listed EVEMS counts only at the cap the system enforces (NEC 625.42).
- Amps. Total VA ÷ 240 V.
| Result | What it means |
|---|---|
| ≤ 80% of main | Fits the existing service with planning headroom. |
| 81% – 100% | Fits on paper with thin margin; consider load management before adding more. |
| > 100%, ≤ 200 A | A 200 A service upgrade, unless an EVEMS-managed charger brings you back under. |
| > 200 A | Compare a 400 A (Class 320) service with smart-panel load management. |
| Hazard panel brand | Replacement flag regardless of load: FPE, Zinsco, Challenger, Pushmatic, fuse boxes. |
The full formulas, the pricing model and their limits are on the calculation methodology page. Code changes behind the 2 VA toggle are explained in NEC 2026 load calculation changes.
What an online calculation cannot see
Breaker spaces left in the panel, the condition of the meter base and service conductors, aluminum branch wiring, and what your utility will allow on the existing transformer. A licensed electrician confirms these on site before anything is quoted as final.