Light Commercial Electrical Service, 3-Phase Distribution & Tenant Build-Outs

A scoping guide for owners and managers: choosing service voltage, proving capacity with a 30-day load study, what needs stamped drawings, and what commercial electrical work costs in 2026.

Electrician in high-visibility gear inspecting a commercial electrical panel
$5,000 – $50,000+Typical light commercial scope

Who this is for

Owners and managers of small and mid-size commercial property: retail and restaurant tenant spaces, offices, light industrial and warehouse units, mixed-use buildings and multifamily common areas — plus businesses adding workplace or fleet EV charging. Projects typically run $5,000 to $50,000+.

  • Tenant build-outs and change-of-use fit-outs
  • Service upgrades and new three-phase services
  • Restaurant kitchen equipment circuits and hood interlocks
  • Workplace and fleet Level 2 charging, with load management
  • Lighting retrofits and controls for energy code compliance

208Y/120 V or 480Y/277 V?

208Y/120 V three-phase480Y/277 V three-phase
Typical buildingsRetail, restaurants, small offices, multifamilyWarehouses, larger offices, light manufacturing
StrengthsRuns 120 V receptacles and most commercial kitchen and HVAC equipment directlySmaller conductors for large loads; 277 V lighting
Trade-offLarger conductors and gear at high amperageNeeds step-down transformers for 120 V loads
EV charging noteMany Level 2 chargers run at 208 V: about 13% less power than at 240 VLevel 2 needs a transformer; DC fast chargers often fed at 480 V

Sizing an existing service: the 30-day load study

For an existing building, NEC 220.87 (120.87 in NEC 2026) lets the maximum demand be taken from real data instead of a full calculation: 12 months of utility demand records, or a 30-day recorded load study at the service. The highest demand found is multiplied by 125%, and the new load is added. It is often the difference between "you need a new service" and "you have room".

MethodDataWhen to use
Utility demand history (220.87 / 120.87)Highest 15-minute demand over 12 months × 125%Building has demand-metered service
Recorded load study30 days of continuous metering × 125%No demand history, or a recent change of use
Standard calculation (Article 220 / 120)Connected loads with demand factorsNew service, or major change of use
Rows of EMT conduit running along a brick wall in a commercial building
Commercial work is permitted on stamped drawings in most jurisdictions once projects pass a size threshold.

Permits, drawings and timing

  • Stamped drawings. Many jurisdictions require electrical drawings sealed by a licensed professional engineer above a threshold (often a new service, or loads above a set kVA).
  • Utility lead times. New three-phase services and transformer changes run 8–26 weeks depending on the utility and equipment availability.
  • Gear lead times. Switchboards and large panelboards can take months; order early.
  • Inspections. Rough-in, cover and final, plus fire-alarm and life-safety coordination where applicable.

Typical commercial project ranges

Excludes utility charges and engineering fees, which vary widely.
ProjectTypical 2026 range
Small tenant fit-out (1,500–3,000 sq ft office or retail)$5,000 – $25,000
Restaurant fit-out electrical$20,000 – $50,000+
Service upgrade to 400–800 A three-phase$15,000 – $50,000+
Workplace Level 2 charging, 4–8 ports with load management$12,000 – $40,000

Scope a commercial project

Tell us the building, service voltage, current amperage and what you are adding. A licensed commercial electrical contractor reviews the scope and quotes.

Get a scoped quote, not a guess

Send your NEC load sheet, panel brand and ZIP code. A licensed local master electrician confirms the numbers on site, pulls the permit and quotes the real job.