Standards we work to

  • Formulas follow the National Electrical Code optional method for dwellings (NEC 2023 220.82 / NEC 2026 120.82) and NEC 702.4 for optional standby systems.
  • Every result shows its line items and the section it comes from, so an electrician or inspector can check it.
  • Cost ranges are 2026 installed prices — equipment, labor, permit and inspection — never "starting at" figures.
  • No result is presented as final: a licensed electrician and the local AHJ make the final call.

Load calculator: formulas

1. General load G — 220.82(B) / 120.82(B)

G = A × v + 1,500 × nSA + 1,500 × nL + Σ appliance nameplate VA

where A is habitable square footage, v = 3 VA/sq ft (NEC 2023) or 2 VA/sq ft (NEC 2026, per 120.41), nSA ≥ 2 small-appliance circuits and nL ≥ 1 laundry circuit. Fastened-in-place appliances count at nameplate; the dryer counts at no less than 5,000 VA.

2. Demand factor

DG = min(G, 10,000) + 0.40 × max(G − 10,000, 0)

3. Heating and air conditioning — 220.82(C) / 120.82(C)

The largest of the following is added (they are non-coincident):

SelectionCounted as
Air conditioning / cooling100% of nameplate
Heat pump without supplemental heat100% of compressor
Heat pump with supplemental electric heat100% of compressor + 65% of supplemental; if controls prevent simultaneous operation, the larger of the two (compressor, or 65% of supplemental)
Central electric space heat65% of nameplate
Separately controlled space heaters65% if fewer than four units; 40% if four or more

4. EV charging — 220.57 / 120.57 and 625.42

Unmanaged: EV = max(I × 240, 7,200) VA, optionally × 1.25 where the AHJ treats the charger as a continuous load on the service. Managed by a listed EVEMS: EV = Icap × 240 VA, where Icap is the maximum the system enforces (0, 16 or 24 A in the tool). AHJs differ on whether the charger sits inside G (subject to the 40% factor) or outside it at 100%; we add it outside G, the conservative treatment.

5. Result

Total VA = DG + HVAC + EV; Demand amps = Total VA ÷ 240. Utilization is demand amps ÷ main breaker rating. Verdict thresholds: ≤ 80% fits, 81–100% near capacity, above 100% upgrade (200 A path up to 200 A, 400 A vs. smart panel above). Hazard panel brands override the verdict.

Generator sizer: model

ComponentAssumption
Base load, whole home3.0 kW + 1.5 W per sq ft (lighting, refrigeration, blower, receptacles)
Base load, essential circuits3.5 kW + 0.5 W per sq ft
A/C running≈ 1.2 kW per ton
A/C starting surge≈ 5 kW per ton; × 0.4 with a soft starter
Heavy loads (running kW)Range 8.0 · dryer 5.0 · water heater 4.5 · well pump 1.5 (4.5 starting) · pool/spa 6.0 · EV 7.7
Diversity75% when two or more heavy loads are unmanaged
Load shedding (702.4)Managed loads never coincide: only the largest managed load counts at 100%
Required ratingmax(running ÷ 0.8, peak ÷ 1.25)
Natural gas deratingAir-cooled ≈ 10% below LP rating (e.g. 24 kW LP → 21 kW NG)

These are planning assumptions that match typical dealer sizing; a dealer's final sizing uses the exact compressor locked-rotor amps and the generator model's published starting capability.

Rows of circuit breakers with color-coded wiring in an electrical panel
Line-item transparency: every figure on a Reilly Electrical sheet can be traced to an input and a code section.

Pricing model

Cost ranges come from published 2026 installer pricing, manufacturer list prices for panels, transfer switches, generators and EV equipment, permit fee schedules, and utility service-upgrade fee schedules. Each line item is a national-average low–high range; the regional tier multiplies labor-heavy items:

Regional tierLoad calculatorGenerator sizer (non-unit items)
National average× 1.00× 1.00
Moderate / suburban metro× 1.10× 1.08
High-cost coastal / Northeast / CA metro× 1.35× 1.30

Utility fees are shown as a wide range because they are set by each utility after its own design work and can exceed the high figure when a new transformer or long secondary is needed. We review ranges against new market data periodically and update the pages when they move.

Verification boundaries

An online calculation cannot see breaker spaces, conductor condition, aluminum branch wiring, grounding, meter base condition, the utility transformer's capacity or local amendments. That is why every Reilly Electrical scope ends with an on-site survey by a licensed local master electrician, a permit, and an inspection by the Authority Having Jurisdiction. See our engineering disclaimer.

Put the method to work